TIM 172QManagement of Technology Project II
Second of a two-course project sequence in which students apply the knowledge and skills gained in TIM 172B to complete the second part of a major comprehensive team project in the management of technology. In this course, taken concurrently with TIM 172B, the team project focus is on the supply chain management for the new product developed in TIM 172P. TIM 172B and TIM 172Q together form the second part of the required management of technology comprehensive requirement for the TIM B.S. major.
Prerequisite(s): TIM 172A and TIM 172P. Concurrent enrollment in TIM 172B is required.
- Concurrent enrollment in TIM 172B is required. This lab meets on T/TH at the same time and same room as TIM 172B.
Find a section and add it to your scheduleLive seat counts, time-conflict checks and the walk from your previous class.
When it runs
Winter 2027Open Winter 2027
| Section | Type | When | Where | Instructor | Seats |
|---|---|---|---|---|---|
| 01 | Laboratory | Asynchronous | — | T. R. Munger | Open 0/100 |
Winter 2026Open Winter 2026
| Section | Type | When | Where | Instructor | Seats |
|---|---|---|---|---|---|
| 01 | Laboratory | TBA | TBD In Person | S. Desa | Open 94/95 |
Who teaches it
| Instructor | Rating | Difficulty | Would take again | Reviews |
|---|---|---|---|---|
| Tyler Munger | 5.0 / 5 | 2.6 / 5 | 100% | 14 |
| Subhas Desa | 3.3 / 5 | 3.3 / 5 | 44% | 72 |
From RateMyProfessors, which is student-submitted and not a survey. Small review counts move a long way on one bad quarter.
SlugAtlas is a student project and is not affiliated with, endorsed by, or operated by UC Santa Cruz. Course data is a snapshot of the public class search; myUCSC is authoritative for enrolment.